TEL: +44 (0) 1256 362963

C-TAS Logo

Heathrow Terminal 3 Integrated Baggage

Terminal 3 had a split departures and arrivals baggage system. C-TAS were appointed to develop layouts for an integrated baggage facility. The appointment ran from concept right through to construction. The new facility was developed to handle 40% additional bags but also included innovative features including robot build stations and batch delivery. C-TAS were also tasked with developing the traffic element of the design, including the internal layout and the evolution of external works from temporary to permanent arrangement. This required a high level of coordination with the architectural and baggage designers to achieve the optimum layout.

We use cookies on this site to improve your experience. By continuing to browse the site you are agreeing to our use of cookies. You will only see this message once. Find out more

close